Air Compressor Delivery and Installation Guide

Delivery and installation affect how quickly a compressor starts producing. Planning the foundation, utilities and commissioning avoids delays.

Before Delivery

  • Prepare the foundation and machine room.
  • Arrange power, water and ventilation.
  • Confirm access for unloading.

Installation

  • Position and level the machine.
  • Connect power, piping and controls.
  • Check all connections before startup.

Commissioning

  • Run the machine and verify performance.
  • Set pressure and control parameters.
  • Train operators and hand over documentation.

Who is responsible for installation?

Confirm with the supplier. Installation and commissioning are sometimes included, sometimes extra.